Paper Title : Factors affecting the labour productivity of brickwork and analyzing them using RII method
Author Name : Mahesh S. Singh, Tejaswini D. N., Raju Narwade and Karthik Nagarajan
Abstract :

Productivity is one of the major problems which affects the duration of the project. There are many factors which affect productivity like climate, type of material, supervision etc. In the current research, the factors affecting the labour productivity of brickwork activity are identified through a literature survey and discussions with industry experts. Total 27 factors were identified and a survey questionnaire was prepared which was distributed among the site engineers to rate factors on a Likert scale from 1 to 5. To make the questionnaire simple the factors were distributed into 3 main groups such as (i) management, (ii) project specification and (iii) human and labour. The questionnaire was distributed among 130 under construction sites and data was obtained. The data analysis was done through the relative importance index and ranking of factors was done which showed results as (i) training, (ii) quality required, (iii) experience, (iv) safety training, (v) proper scheduling and (vi) over time. These top 6 factors were responsible for affecting the labour productivity of brickwork the most.

Keywords : Brickwork, Labour productivity, Relative importance index, Construction industry, Management.
Cite this article : Singh MS, D. N. T, Narwade R, Nagarajan K. Factors affecting the labour productivity of brickwork and analyzing them using RII method. International Journal of Advanced Technology and Engineering Exploration. 2019; 6(54):143-151. DOI:10.19101/IJATEE.2019.650043.
References :
[1]Soham M, Rajiv B. Critical factors affecting labour productivity in construction projects: case study of south Gujarat region of India. International Journal of Engineering and Advanced Technology. 2013; 2(4):583-91.
[Google Scholar]
[2]Jergeas GF, McTague R. Construction productivity: an auditing and measuring tool. AACE International Transactions. 2002:CS91.
[Google Scholar]
[3]Yi W, Chan AP. Critical review of labor productivity research in construction journals. Journal of Management in Engineering. 2013; 30(2):214-25.
[Google Scholar]
[4]Arditi D. Construction productivity improvement. Journal of Construction Engineering and Management. 1985; 111(1):1-4.
[Google Scholar]
[5]Peles CJ. Productivity analysis–a case study. In transaction of the american association of cost engineers, 31st Annual Meeting, Atlanta 1987.
[Google Scholar]
[6]Handa VK, Abdalla O. Forecasting productivity by work sampling. Construction Management and Economics. 1989; 7(1):19-28.
[Crossref] [Google Scholar]
[7]Allmon E, Haas CT, Borcherding JD, Goodrum PM. US construction labor productivity trends, 1970–1998. Journal of Construction Engineering and Management. 2000; 126(2):97-104.
[Crossref] [Google Scholar]
[8]Arditi D, Mochtar K. Trends in productivity improvement in the US construction industry. Construction Management & Economics. 2000; 18(1):15-27.
[Crossref] [Google Scholar]
[9]Kenley R. More for less: a contractors guide to improving productivity in construction. Construction Management & Economics. 2002.
[Google Scholar]
[10]Tahir MA, Hashimhanif SZ, Hanif A. Factors affecting labor productivity in building projects of Pakistan. In proceedings of the seventh IIER international conference 2015.
[Google Scholar]
[11]Abdul Kadir MR, Lee WP, Jaafar MS, Sapuan SM, Ali AA. Factors affecting construction labour productivity for Malaysian residential projects. Structural Survey. 2005; 23(1):42-54.
[Crossref] [Google Scholar]
[12]Enshassi A, Mohamed S, Mustafa ZA, Mayer PE. Factors affecting labour productivity in building projects in the Gaza Strip. Journal of Civil Engineering and Management. 2007; 13(4):245-54.
[Google Scholar]
[13]Dai J, Goodrum PM, Maloney WF. Analysis of craft workers and foremens perceptions of the factors affecting construction labour productivity. Construction Management and Economics. 2007; 25(11):1139-52.
[Google Scholar]
[14]Jarkas AM, Bitar CG. Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management. 2011; 138(7):811-20.
[Crossref] [Google Scholar]
[15]Hafez SM, Aziz RF, Morgan ES, Abdullah MM, Ahmed EK. Critical factors affecting construction labor productivity in Egypt. American Journal of Civil Engineering. 2014; 2(2):35-40.
[Google Scholar]
[16]Alaghbari W, Al-Sakkaf AA, Sultan B. Factors affecting construction labour productivity in Yemen. International Journal of Construction Management. 2019; 19(1):79-91.
[Crossref] [Google Scholar]
[17]Rahman IA, Memon AH, Memon AQ, Shaikh MA, Siddiqui F. Factors affecting the labour productivity in construction projects of Pakistan. In MATEC Web of Conferences 2019.
[Crossref] [Google Scholar]
[18]Gerges M, Ahiakwo O, Kapogiannis G, Saidani M, Saraireh D. Investigating and ranking labor productivity factors in the Egyptian construction industry. Journal of Architecture. 2011; 5(1):44-52.
[Google Scholar]
[19]Porntepkasemsant P, Charoenpornpattana S. Factor affecting construction labor productivity in Thailand. In international conference on industrial engineering and operations management 2015 (pp. 1-6). IEEE.
[Crossref] [Google Scholar]
[20]Olomolaiye PO, Wahab KA, Price AD. Problems influencing craftsmens productivity in Nigeria. Building and Environment. 1987; 22(4):317-23.
[Google Scholar]
[21]Zakeri M, Olomolaiye PO, Holt GD, Harris FC. A survey of constraints on Iranian construction operatives productivity. Construction Management & Economics. 1996; 14(5):417-26.
[Google Scholar]
[22]Soekiman A, Pribadi KS, Soemardi BW, Wirahadikusumah RD. Factors relating to labor productivity affecting the project schedule performance in Indonesia. Procedia Engineering. 2011; 14:865-73.
[Crossref] [Google Scholar]
[23]Rad KG, Kim SY. Factors affecting construction labor productivity: Iran case study. Iranian Journal of Science and Technology, Transactions of Civil Engineering. 2018; 42(3).
[Crossref] [Google Scholar]
[24]El-Gohary KM, Aziz RF. Factor’s influencing construction labor productivity in Egypt. Journal of Management in Engineering. 2013; 30(1):1-9.
[Crossref] [Google Scholar]
[25]Jarkas AM. Factors influencing labour productivity in Bahrains construction industry. International Journal of Construction Management. 2015; 15(1):94-108.
[Crossref] [Google Scholar]
[26]Hickson BG, Ellis LA. Factors affecting construction labour productivity in Trinidad and Tobago. The Journal of the Association of Professional engineers of Trinidad and Tobago. 2014; 42(1):4-11.
[Google Scholar]